Mechanical room with a polished copper manifold and tankless water heaters

Construction

Everything difficult happens before the drywall.

Whole-home renovations and ground-up builds, plumbed from the underground work up.

A renovation is decided at the rough-in. Every line has one route through the home, and each one has to clear the others: two crossed badly is a connection that never seals or a line that bursts behind a finished wall.

We take the underground work, the distribution, and the connections to the main and the sewer, then hand the home back in a state the next twenty years can be serviced from. The general contractor keeps the schedule; we keep the pipe.

The work

What we take on

  • Underground and rough-in

    The below-slab work and the in-wall distribution, set to the drawings before the home closes up.

  • Water service and distribution

    New supply from the main, run so filtration can be added later without opening finished work.

  • Sewer connection

    Connections made precisely. An imprecise one backs up into the home it serves.

  • Gas distribution

    Lines for furnaces, ovens, grills, and water heaters, kept clear of anything that would put pressure on them.

  • Mechanical rooms

    Water heaters, manifolds, and hydronic radiant heating, laid out so the room can be worked in later.

  • Permits and inspections

    California Uniform Plumbing Code and San Francisco’s building department requirements, inspection by inspection.

Questions

What clients ask first

Begin

Tell us about the home. We’ll take it from here.

A consultation for your build, your remodel, or a place in the Membership. If it’s an emergency, call us now.

Plumbing Emergency. Call NowBook a Consultation